Stelion Industry Geneva
46.232°N 6.045°E — EN ISO 3834

Welding, piping & HVAC.

to the standard of the most demanding sites

EN ISO 3834 certified, our team of 36 specialists operates across Switzerland and France — pharma, energy, petrochemicals. Detailed quote within 48h.

They trust us
  • F. Hoffmann-La Roche
  • CERN
  • Nestlé
  • Novartis
  • SIG Genève
  • EDF
36
Certified specialists
50+
Projects completed
2
Countries of operation
48h
To receive your quote
EN ISO 3834ISO 9606-1ASME IXEN 13480EN ISO 15614ATEX / DESP
Your challenges

What really costs money on an industrial site

01

The shutdown that overruns

Every hour of unplanned downtime costs tens of thousands. A job that overruns by three days is a production line that doesn't restart.

02

The non-conformity found in an audit

One untraceable weld or incomplete file found in a client or FDA audit, and an entire line goes back into qualification.

03

Trades passing the buck

Welding, piping and HVAC split across three companies: three schedules, three managers, zero overall accountability.

The difference

What it changes for you

Coordination

Without an integrated partnerOne contractor per trade, coordination on your plate

With STELIONA single point of contact, accountable end to end

Quotation

Without an integrated partnerWeeks of waiting, vague scopes

With STELIONA detailed technical quote within 48h

Traceability

Without an integrated partnerScattered files, untraced welds

With STELIONA complete quality file handed over at acceptance

Progress

Without an integrated partnerOpaque progress, discovered in meetings

With STELIONA daily progress review throughout the job

Shutdown window

Without an integrated partnerSlow mobilisation, window overrun

With STELIONTeams mobilised within 48h, schedule aligned with your shutdown

Job-site intelligence

Stelion OS, our proprietary ERP, coordinates every stage of your projects.

Total visibility, complete traceability, uncompromising execution.

Stelion OS is the tool our teams use every day: preparation, scheduling, weld traceability, inspections, invoicing. What it changes for you: a continuously documented job, and a complete file at acceptance.

01Dashboard02Quotes03Job sites04Scheduling05QHSE06Reporting07Invoicing

Real-time steering

Progress, schedule and teams tracked day by day, from quote to acceptance.

Full traceability

Materials, welds and NDT inspections recorded as the job progresses — nothing is reconstructed from memory.

Regular reporting

A progress update shared with your teams throughout the intervention.

Digital as-built file

The complete as-built file, handed over at acceptance, ready for your audits.

See Stelion OS in action
Our Projects

Projects Completed with Excellence

See all our projects
01
PharmaceuticalsBasel, Switzerland · April 2024

WFI Circuit Extension — Roche

Partial extension of an existing WFI circuit — replacement of 3 degraded sections and addition of a branch to a new filling station. IQ/OQ documentation provided.

F. Hoffmann-La Roche AG316L StainlessOrbital WeldingGMP/FDA
02
EnergyGeneva, Switzerland · June 2024

Steam Network Replacement — SIG

Replacement of an ageing steam network section in a distribution substation. 85 m of piping, 64 TIG welds, completed during a 2-week shutdown.

SIG — Services Industriels de GenèveLow-pressure steamP235GH SteelTIG Welding
03
Food & BeverageVevey, Switzerland · October 2024

Process Circuits — Nestlé Vevey

Replacement of fittings and degraded sections on an existing production line. Planned 10-day shutdown, 38 m of 304L stainless piping, CIP validation.

Nestlé S.A.304L StainlessEHEDGCIP
04
PharmaceuticalsBasel, Switzerland · December 2024

Clean Room HVAC — Novartis

Upgrade of the HVAC system in an existing ISO 7 clean room — replacement of the air handling unit and recalibration of the regulation. Validated OQ/PQ qualification.

Novartis AGGMP VentilationHEPA H14 FiltrationISO 7
05
PetrochemicalsLyon, France · June 2024

Maintenance Shutdown — TotalEnergies

Maintenance shutdown with replacement of 120 m of degraded pipelines. ATEX zone intervention, automatic welding, 100% NDT inspection.

TotalEnergiesAPI 5LATEX zone100% NDT
06
Data & TechStrasbourg, France · November 2024

Cooling — OVHcloud Data Centre

Replacement of 2 end-of-life chillers and upgrade of the free-cooling system on an existing data centre. No service interruption, N+1 redundancy maintained.

OVHcloudData centre coolingFree-coolingN+1 redundancy
Our process

A controlled process, from enquiry to acceptance.

Every project follows a clear, rigorous sequence. Our commitment: meet the deadlines, guarantee quality and document every step.

  1. 01

    Answer within 48 h

    Analysis of your request and a detailed quote within 48 hours.

  2. 02

    Single point of contact

    A dedicated project manager, from quote to acceptance.

  3. 03

    Shutdown window held

    Hour-by-hour scheduling and workshop prefabrication: the date is met.

  4. 04

    Transparency

    A daily review with your teams: you always know where things stand.

  5. 05

    Complete documentation

    Traceability, inspection reports and welding books handed over at acceptance.

The team

Real faces, not stock photos

This site only shows our teams and our job sites — never generated images, never actors.

Abdel Lagragui and Serge, smiling in protective equipment on a job site
Abdel Lagragui & Serge — on siteSTELION

Let's talk about your project.

Detailed quote within 48h. Call or write to us — an engineer will answer.