Technical shutdowns.

Shutdown maintenance — 48h mobilisation

Pipe section replacement, qualified welding, NDT inspection — our teams mobilise within 48h for your planned shutdowns, with a complete quality file at handover.

48h
Team mobilisation
15+
ISO 9606 qualified welders
100%
NDT-inspected welds
2
Offices — Switzerland & France
Why manufacturers trust us with their shutdowns
01

Upstream preparation

On-site surveys before the shutdown, isometric drawings, validated WPS/PQR, maximum workshop prefabrication. When the shutdown starts, everything is ready.

02

48h mobilisation

Teams assembled from our Geneva and Lyon offices: qualified welders, pipefitters, dedicated site manager. Weekday, weekend or shifted-hours interventions to match your window.

03

Controlled execution

EN ISO 9606-1 and ASME IX qualified welding, NDT integrated throughout the job (penetrant testing, radiography), daily coordination with your maintenance teams.

04

Quality file at handover

Complete material traceability, inspection reports, welding books. Your installation restarts with audit-ready documentation.

The typical sequence
01

Visit & scoping

On-site surveys, analysis of the sections involved, access and safety constraints.

02

Quote & schedule

Quotation within 48h, hour-by-hour schedule aligned with your shutdown window.

03

Prefabrication

Workshop preparation of sub-assemblies to reduce on-site intervention time.

04

Intervention

Removal, welding, continuous NDT. Daily progress review with your teams.

05

Handover & restart

Pressure tests, complete quality file, support during installation restart.

EN ISO 9606-1ASME IXEN 13480MASE/VCA